normal_post - Davao Light imposes four-hour power cut off - Philippine Daily News Author Topic: Davao Light imposes four-hour power cut off  (Read 414 times)

MIKELIGALIG.com

  • FOUNDER
  • Webmaster
  • *****
  • avatar_1382_1499847132 - Davao Light imposes four-hour power cut off - Philippine Daily News
  • Posts: 23807
  • medal1 - Davao Light imposes four-hour power cut off - Philippine Daily Newsmedal2 - Davao Light imposes four-hour power cut off - Philippine Daily Newsmedal3 - Davao Light imposes four-hour power cut off - Philippine Daily News
  • NEED A WEBSITE? email me: info@mikeligalig.com
    • Share Post
xx - Davao Light imposes four-hour power cut off - Philippine Daily News
Davao Light imposes four-hour power cut off
« on: July 30, 2015, 08:36:59 PM »
Davao Light imposes four-hour power cut off
By Lilian C. Mellejor

DAVAO CITY, July 30 (PNA) -- Davao Light and Power Co.(DLPC) started Thursday imposing a maximum of three to four hours of rotating power interruptions in this city and franchise areas in Davao del Norte.

This developed after the Therma South Inc. (TSI) coal plant shut down for an unscheduled repair. The TSI coal plant is still under commissioning stage.

Davao Light gets 60 megawatts from TSI to mitigate the power deficit for the past weeks. With 60MW lost, that would mean four hours of blackout, DLPC Executive Vice President and Chief Operating Officer, Arturo Milan said.

“TSI will shut down anytime today (Thursday). It is still under a commissioning stage and will do a lot of adjustments. This is beyond DLPC's control,” Milan said at the presentation of the 2014 report on the Economic Performance of Davao Region at Ritz Hotel on Thursday.

Milan said Davao Light was receiving 163 megawatts (MW) from National Power Corp. (NPC) – Power Sector Assets and Liabilities Management (PSALM), which was below the 275-contracted average demand. The peak demand reached 326 MWs.

Since TSI is still in the commissioning stage, it is expected that it will trip 80-90 percent of the time since it is not easy to connect to the grid.

Just last week, DLPC has increased the duration of its power interruption from a maximum of one to two hours after the National Grid Corp. of the Philippines (NGCP) advised an increase in the power supply shortage in Mindanao from 60 MWs to 130 MWs.

Milan said TSI’s 60 MWs eased the power outages while STEAG State Power plant remained offline as it underwent an emergency shutdown from July 18 to Aug. 16 on one unit coal-fired plant at Barangay Villanueva, Misamis Oriental.

He also said Pulangi and Agus Hydroelectric plants were also not working due to low water level while the Mt. Apo source had shut down since July 18.

In a press statement, DLPC said increase in power outages was necessary to avoid breakdown of the entire distribution system, which happens when the demand is higher than what is being supplied.

Corporate Communications Officer Rossano Luga said DLPC continued to implement its contingency measures in order to cushion the impact of the supply shortage.

Davao Light is running its standby Bajada Power Plant, optimizing on its embedded Sibulan and Talomo Hydropower plants and supply agreement with TMI. It is also activating its Interruptible Load Program (ILP).

Milan said Davao Light was running its 33-MW Bajada plant and it was also receiving 30 MWs from TMI, 37 MWs from Hedcor and 38 MW from ILP.

“We know that Mindanao does not have reserve so that is the situation now,” Milan said. (PNA)

Linkback: https://tubagbohol.mikeligalig.com/index.php?topic=80625.0
Romans 10:9-10
"If you declare with your mouth, Jesus is Lord, and believe in your heart that God raised him from the dead, you will be saved. For it is with your heart that you believe and are justified, and it is with your mouth that you profess your faith and are saved."

Get FREE 500GB cloud storage:
https://www.pcloud.com/welcome-to-pcloud/?discountcode=fDiE7jtC01VPbCIygaM67jZV



Share via facebook Share via linkedin Share via pinterest Share via reddit Share via twitter
 

Latest Topics

Mandaue to Tubigon, Bohol Liteferry Schedule by MIKELIGALIG.com
[October 20, 2019, 10:07:58 PM]


Tubigon to Mandaue Cebu Liteferry by MIKELIGALIG.com
[October 20, 2019, 10:04:09 PM]


Tubigon to Cebu Liteferry Boat Schedule by MIKELIGALIG.com
[October 20, 2019, 09:45:54 PM]


Cebu to Tubigon Liteferry Boat Schedule by MIKELIGALIG.com
[October 20, 2019, 09:24:25 PM]


DILG Circular Does Not Cover Cutting of Trees by MIKELIGALIG.com
[October 20, 2019, 04:12:10 PM]


BILECO AGMA 2019 by MIKELIGALIG.com
[October 20, 2019, 07:50:02 AM]


John Chapter 1 Tagalog Language by MIKELIGALIG.com
[October 20, 2019, 07:38:11 AM]


Jesus’ message to the believers at Ephesus by MIKELIGALIG.com
[October 20, 2019, 07:29:03 AM]


Jesus’ message to the believers at Sardis by MIKELIGALIG.com
[October 20, 2019, 07:28:12 AM]


God on His Throne by MIKELIGALIG.com
[October 20, 2019, 07:27:22 AM]

SMF spam blocked by CleanTalk
Powered by SMFPacks SEO Pro Mod | Sitemap
Mobile View
SimplePortal 2.3.7 © 2008-2019, SimplePortal