Author Topic: VECO Power Interruption November 26 2022  (Read 258 times)

mikeortegaligalig

  • EXPERT
  • ***
  • Posts: 1005
    • View Profile
VECO Power Interruption November 26 2022
« on: November 23, 2022, 01:32:25 PM »
SCHEDULED POWER INTERRUPTIONS FROM NOVEMBER 26 - DECEMBER 02, 2022.

November 26, 2022 (Saturday)
[1] Time: 8:00 AM to 12:00 PM (4hrs)
Purpose: To increase the capacity of the distribution system serving Brgy. Pit-os & Pulangbato by facilitating extension of primary lines (line stringing)
Areas Affected:
Portion of Cebu City (Pit-os & Pulangbato) including Metropolis Subdivision.
 
[2] Time: 8:00 AM to 12:00 PM (4hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Lahug by facilitating installation of distribution transformer and installation of primary pole
Areas Affected:
Portion of Cebu City (Lahug) along Sunset Drive including Sitio Sudlon Tophills, Civil Service Commission Reg 7, Commission On Higher Education, NEDA Regional Office, Dept Of Science & Technology and DENR.
 
[3] Time: 6:00 AM to 9:00 AM (3hrs)
Purpose: To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. San Roque by facilitating removal of primary pole
Areas Affected:
Portion of Cebu City (San Roque) along Legaspi St. including Wenthworth Dev. Corp., Che Yong Investment, Cebu Landmasters Inc., Benedicto & Sons Co., CSFP Condominium Inc., Department Of Trade & Industry, City Savings Bank, Inc., Mactan Rock Industries Inc., Brgy Snr. Sto Nino-Brgy Hall, Cebu Belmont Inc., Causing - Lozada Inc., Rizal Commercial Banking Corp., Cebu Che Yong Cua & Chua Bldg., Integrated Mgmt. Svcs. Inc., San Roque Sports Complex, Cebu City Local  School Board Office, Catholic Women League and Lianting Dev Corp.
 
[4] Time: 9:00 AM to 5:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Kinasang‑an Pardo & Quiot by facilitating replacement of primary pole
Areas Affected:
Portion of Cebu City (Kinasang‑an Pardo & Quiot) along E. Sabellano St. including portions of Sitios Kamansi, Suran, Idiang, and Mahayahay, and San Vicente Ferrer Chapel.
 
[5] Time: 9:00 AM to 5:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. San Vicente by facilitating installation of primary pole
Areas Affected:
Portion of Liloan (San Vicente) including portion of Sitio Tabay-Lawom and San Vicente Chapel.
 
[6] Time: 9:00 AM to 5:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Tungkop by facilitating secondary line upgrading and tapping of service entrance wire
Areas Affected:
Portion of Minglanilla (Tungkop) along Tungkop Road including portion of Sitio Acacia.
 
 
November 27, 2022 (Sunday)
[1] Time: 8:00 AM to 4:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Poblacion South by facilitating restoration of loops
Areas Affected:
Portion of San Fernando (Poblacion South) along Cebu South Road including portion of Sitio Capangian & Siloy, San Isidro Parish Centrum, M. Lhuillier Pawnshop, San Fernando Rural Bank, and San Fernando Annex Bldg. Extn.
 
[2] Time: 8:00 AM to 4:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Tangke by facilitating line reliability works of primary lines
Areas Affected:
Portion of City of Naga (Tangke) along Aliganga St. including Sitio Manggahan and Tangke Brgy. Hall.
 
[3] Time: 8:00 AM to 4:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Labangon by facilitating installation of distribution transformer and replacement of primary pole
Areas Affected:
Portion of Cebu City (Labangon) along R. Arcenas St. including portion of Sitio Capaculan, Sacred Heart Village, West City Homes Subd., and Acacia Place.
 
[4] Time: 7:00 AM to 2:00 PM (7hrs)
Purpose: To increase the capacity of the distribution system serving Brgy. San Roque by facilitating upgrading of distribution transformer
Areas Affected:
Portion of Cebu City (San Roque) along R. Palma St. including Fast Cargo Transport Corp. and William Lines Inc.
 
 
November 28, 2022 (Monday)
[1] Time: 10:00 AM to 12:00 PM (2hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Talamban & Cabancalan by facilitating repair or replacement of damaged line hardware and line equipment
Areas Affected:
Portion of Cebu City & Mandaue City (Talamban & Cabancalan) including North Town Homes Residences, Aboitiz & Company Premier, Ivor & Red Global Corporation, Taiyo Yuden Phil Inc., Metaphil Incorporated, Andromeda Realty Corp., National Grid Corporation of the Philippines (NGCP), Victor & Sons Realty Corp., Golden Garfield Dev'T Corp., Bauhinia Management Inc., Musix Dreamland Corp., Po Nang Au & Associates Inc., First Realty Int'L Systems Corp., and Greenville Agro Corporation.
 
 
November 28-29, 2022 (Monday-Tuesday)
[1] Time: 10:00 PM of November 28 to 6:00 AM of November 29 (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Ermita & Pahina Central by facilitating removal of primary lines as requested by customer
Areas Affected:
Portion of Cebu City (Ermita & Pahina Central) along M.C. Briones St., F. Calderon St., Escano St., Progresos St., Leon Kilat St., El Filibusterismo St., Manalili St., Lincoln St., Bato Carbon St., Magallanes St. and Kawit St. including portions of Sitios Bato, Kastilaan, Carbon Market, Freedom Park, New Insular Commercial, Yu Franklin JS Mktg., Dennis Mktg., El Popular Panaderia, Keyster Automotive Sales, Avenue Commercial, Lim Tie Commercial, Yu Eng City Mercury Enterprises, Ricron Enterprises, Cebu Suns Trading., New Silver Trading, LapuLapu Merchandising, Fellowship For Organizing Endeavors Inc., Aspac Rural Bank Inc., Lim Bonfing Y Hermanos Inc., Cebu Bionic Builder Supply Inc., You We Tong Foundation Inc., Kings Quality Foods Inc., Centrica One International CO., Speed Works MKTG Corp, Velez Vicente Realty Corp., Yanling Investment Corp. and UCPB.
 
[2] Time: 10:00 PM of November 28 to 6:00 AM of November 29 (8hrs)
Purpose: To improve the reliability of the distribution system serving Brgy. Ermita & Sto. Niño by facilitating removal of primary lines as requested by customer
Areas Affected:
Portion of Cebu City (Ermita & Sto. Niño) along F. Gonzales St., D. Jakosalem St., M. Briones St., Plaridel St., Quezon Blvd., & P. Burgos St. including portions of Carbon Market, Senior Citizen Park, Perlas Marketing, Unson Hardware, Tai Guan Temple Inc., Yu Kim Kee Chua & Co, Rosalins Enterprises, Pacific Star Inc., Ogy Trading Corp., Ong King King & Co.Inc., Benison Commercial Corp., Martinez Agricultural Corp., Woolbright Corp., Bayanihan Multi-Purpose Coop., Sugbu Chinese Heritage Museum Foundation Inc., Wealth Development Bank, Cebu Luneta Seafarers Center Inc., Cebu Fortune Cons Supply, BDO Unibank Inc., and Allied Banking Corp.
 
 
November 29, 2022 (Tuesday)
[1] Time: 9:00 AM to 3:00 PM (6hrs)
Purpose: To increase the capacity of the distribution system serving Brgy. San Nicolas Proper by facilitating upgrading of distribution transformer
Areas Affected:
Portion of Cebu City (San Nicolas Proper) along portion of J.M. Basa St.
 
 
November 30, 2022 (Wednesday)
[1] Time: 9:00 AM to 4:00 PM (7hrs)
Purpose: To prevent unnecessary interruptions due to vegetation in the distribution system serving Brgy. Lataban & San Roque by facilitating trimming of tree branches and leaves
Areas Affected:
Portion of Liloan (Lataban & San Roque) including Puroks Nangka, Saging & Caimito, Sitios Maylao, Ilihan, Balingasao, Kawasan & Mapulo, and San Roque Chapel.

December 2, 2022 (Friday)
[1] Time: 8:00 AM to 4:00 PM (8hrs)
Purpose: To improve the reliability of the distribution system serving South Reclamation Area by facilitating repair or replacement of damaged line hardware and line equipment
Areas Affected:
Portion of Cebu City (South Reclamation Area) along SRP Back Road and Cebu South Coastal Road including San Remo Oasis, Amalfi Oasis, City di Mare, DPWH Reg. 7, Anseca Dev’t. Corp., Filinvest Land Inc., The Ranch Resort Inc. and ERMM Repair Bay.

Your safety is important to us. Visayan Electric would like to remind the public to always take extra precautions when passing by areas where line repairs and maintenance are being done.
Please stay away from the barricaded area especially since our personnel are using heavy equipment and are dealing with live wire.

Get FREE 1024GB of cloud storage at www.terabox.com



Linkback: https://tubagbohol.mikeligalig.com/index.php?topic=123537.0

unionbank online loan application low interest, credit card, easy and fast approval

Tags: