Author Topic: Another Bayongan Dam Blunder  (Read 841 times)

pioneer

  • To God be the glory alone
  • FOUNDER
  • GURU
  • *****
  • Posts: 18911
  • stay at home
    • View Profile
    • spiritual preparation
Another Bayongan Dam Blunder
« on: January 19, 2008, 10:21:00 AM »
By Kit Bagaipo
The Bohol Chronicle

Fears that the country's most expensive irrigation project could not attain its ideal water level to irrigate 5,300 hectares of its service area fizzled out.

This, as the reservoir of the P3.6-billion Bayongan Dam has overflowed due to continued rains in the past weeks.

The 314-hectare reservoir of the irrigation project has surpassed its desired water depth reaching the maximum water elevation of 52-meters.

Linkback: https://tubagbohol.mikeligalig.com/index.php?topic=8713.0
Romans 10:9
"That if you shall confess with your mouth the Lord Jesus, and shall believe in your heart that God has raised him from the dead, you shall be saved."
👇👇👇
Na-try mo na ba yung Tala app? Reliable sa unexpected expenses at laking tulong sa future! Use this code 9SO1TSL or visit www.tala.com to sign up!

unionbank online loan application low interest, credit card, easy and fast approval

Tags: