normal_post - National Renewable Energy Board (NREB) - Philippine Daily News Author Topic: National Renewable Energy Board (NREB)  (Read 475 times)

MIKELIGALIG.com

  • FOUNDER
  • Webmaster
  • *****
  • avatar_1382_1499847132 - National Renewable Energy Board (NREB) - Philippine Daily News
  • Posts: 24571
  • medal1 - National Renewable Energy Board (NREB) - Philippine Daily Newsmedal2 - National Renewable Energy Board (NREB) - Philippine Daily Newsmedal3 - National Renewable Energy Board (NREB) - Philippine Daily News
  • NEED A WEBSITE? email me: info@mikeligalig.com
    • Share Post
xx - National Renewable Energy Board (NREB) - Philippine Daily News
National Renewable Energy Board (NREB)
« on: August 12, 2017, 09:02:50 AM »
The Department of Energy (DOE) and the National Renewable Energy Board (NREB), in cooperation with USAID B-LEADERS, conducted the last Public Consultation for the finalization of the draft rules and guidelines of the Renewable Portfolio Standard (RPS) held on Friday, 11 August 2017 at the DOE’s headquarters in Bonifacio Global City, Taguig.
 
The Luzon leg of the pub-con is the culminating consultation after the Visayas leg in Cebu City and Mindanao leg in Davao City held respectively last 6 July and 26 July.
 
The RPS is a policy mechanism under Republic Act 9513 or the Renewable Energy Act of 2008 that requires electric power industry participants, particularly the distribution utilities, to source or produce a specified fraction of their power supply from eligible RE resources.
 
The main objective of RPS is to increase the utilization of RE by enhancing national and local capabilities on using RE.
 
“Once the RPS is rolled out, energy consumers have more options on what type of energy they want to consume, particularly the clean and sustainable ones. It empowers them to formulate the right energy strategies for them,” Energy Secretary Alfonso Cusi said.
 
The Energy Chief said, “The pub-con is a necessary tool in engaging RE stakeholders in the policy-making by gathering their insights and suggestions to ensure a comprehensive RPS rules and guideline before finalization and endorsement by NREB to the DOE.”
 
Today’s pub-con was led by NREB Chair Atty. Jose Layug, Jr. as Keynote Speaker together with Electric Power Industry Management Bureau (EPIMB) OIC-Director Mario Marasigan and NREB Co-chairman and RPS Chairman Mr. Juan Antonio Bernad.
 
Chair Layug said, “We must ensure that the targets we have set for the RPS should not remain simply as statistics, not even as final destinations, but as milestones upon which new targets will evolve.”
 
Some issues raised during the consultation were the impact of RPS to consumers regarding electricity prices, the implication of RPS to existing power plants, social and environmental impression of the RPS and possible updates on the Competitive Selection Process (CSP) rules among others.
 
Around 300 participants from representatives of government agencies, NREB, international financial institutions, distribution utilities and renewable energy stakeholders attended the Luzon consultation.

Linkback: https://tubagbohol.mikeligalig.com/index.php?topic=87248.0
Romans 10:9-10
"If you declare with your mouth, Jesus is Lord, and believe in your heart that God raised him from the dead, you will be saved. For it is with your heart that you believe and are justified, and it is with your mouth that you profess your faith and are saved."

Where to Stay in Bohol? Book at Dao Diamond Hotel and Restaurant in Tagbilaran City. Online reservation at: https://www.daodiamond.com

Powered by 12Go Asia system


Share via facebook Share via linkedin Share via pinterest Share via reddit Share via twitter
 

Powered by 12Go Asia system

Sign-up or Log-in Free

 
 
Welcome, Guest. Please login or register.

Latest Topics

Curfew Violators in Davao Oriental by MIKELIGALIG.com
[Today at 01:18:17 PM]


Coronavirus and the cool Swedes by hubag bohol
[Today at 12:31:43 PM]


Pinoy food inun-on by balong
[Today at 09:45:04 AM]


Life's Timeline by MIKELIGALIG.com
[Today at 09:15:24 AM]


Situation at Dampas Dumpsite by MIKELIGALIG.com
[Today at 09:14:06 AM]


Tagbilaran Dump Site Overflowing trash by MIKELIGALIG.com
[Today at 09:11:40 AM]


Tagbilaran Dumpsite Closed by DENR by MIKELIGALIG.com
[Today at 09:10:13 AM]


Anniversary Failed by MIKELIGALIG.com
[Today at 09:08:26 AM]


Lechon Failed by MIKELIGALIG.com
[Today at 09:07:35 AM]


Mother-son FB meme by MIKELIGALIG.com
[Today at 09:06:38 AM]

SMF spam blocked by CleanTalk
Powered by SMFPacks SEO Pro Mod | Sitemap
Mobile View
SimplePortal 2.3.7 © 2008-2020, SimplePortal