Longest Tunnel Road in the Philippines
Build Build Build: Davao City Bypass Road
Developments to the 45.5-kilometer with 2.3-kilometer twin tunnels of the Davao City Bypass Road.
The entire Davao City Bypass Road will begin in Brgy. Sirawan, Toril, Davao City and will end in Brgy. J.P. Laurel, Panabo City, Davao Del Norte.
A total of 56 equipment from Japan, France and Korea are now available on site that includes two batching plant at the north and south portal, and several tunneling equipment such as horizontal boring machine and tools, twin header base machine/crawler excavator, twin header attachment, erecter with shotcrete machine, drill jumbo, and tunnel ventilation and dust collector, wheel loader, truck mixers and water truck.
#RisingPhilippines #RisingDavao #DavaoCity #Japan #BuildBuildBuild
news.mikeligalig.comLinkback:
https://tubagbohol.mikeligalig.com/index.php?topic=121802.0